| | | |
|
Assessment Task 3: Project Documentation |
TASK DESCRIPTION: | You and your team will develop project documentation that contains all the required information ready for project handover.
The project documentation should reflect the requirements of the stakeholders in the respective market.
This assignment item includes self/peer assessment, giving students an opportunity to critically evaluate both self and their peers’ contribution and performance in collaborative effort to meet the requirements of this task, under time pressure. The self/peer assessment component is designed to allow students to demonstrate their ability to reflect on the process and outcomes of teamwork and improve individually and collectively. The self/peer assessment component will influence each team member's result for this assessment task.
|
TASK LENGTH: | The amount of Project Documentation should reflect the requirements of stakeholders and the respective market. |
DUE DATE: | Week 11 |
WEIGHT: | 20 % |
|
CRITERION # | CRITERION | MEASURES INTENDED LEARNING OUTCOME |
| | | 1 | Summarise the project context to provide insight to the problem and stakeholders. | LO2 | 2 | Document individual contributions using team minutes, activity logs and project milestones | LO3 | 3 | Explain the relationship between your individual contributions and professional readiness | LO3 |
|
|
|
Assessment Task 4: The Product and Video |
TASK DESCRIPTION: | Your team will create a 15-minute video presentation (file type .mp4) encompassing the process and outcomes of your work across this unit.
Your presentation will include (as a minimum):
• Details of your project;
• An explanation and demonstration of the functionality of the project, and how this meets the problem and user requirements; • An explanation and justification of the design elements used in the project in order to provide a solution; • A description of the tools that were used to build the product.
This assignment item includes self/peer assessment, giving students an opportunity to critically evaluate both self and their peers’ contribution and performance in collaborative effort to meet the requirements of this task, under time pressure. The self/peer assessment component is designed to allow students to demonstrate their ability to reflect on the process and outcomes of teamwork and improve individually and collectively. The self/peer assessment component will influence each team member's result for this assessment task.
|
TASK LENGTH: | 15 minutes in duration. Peer and Self Review will occur alongside each weighted assessment task for this unit. |
DUE DATE: | Week 14 |
WEIGHT: | 35 % |
|
CRITERION # | CRITERION | MEASURES INTENDED LEARNING OUTCOME |
| | | 1 | Produce an ICT project that meets the problem requirements. | LO1 | 2 | Justify the proposed solutions against professional standards and client requirements. | LO1 | 3 | Identify and describe the types and characteristics of potential users and requirements of the product being developed. | LO2 | 4 | Summarise the project context to provide insight to the problem and stakeholders. | LO2 | 5 | Explain the relationship between your individual contributions and professional readiness | LO3 |
|
|
|